How to tie shingles into an existing roof

To use this method, follow these steps: Prepare the area by identifying where the two roofs will meet. Measure the length of the joined area and add 12 inches. Pick the section where two edges will cross. Install the jack rafters, ensuring they are securely attached to the main rafters..

Aug 26, 2020 ... A partial re-roof can be done and tied into the existing roof and it is best to discuss this with an estimator when they give you a quote. How ...Tommy Silva gives the apprentices a lesson in hip roof framing. SUBSCRIBE to This Old House: http://bit.ly/SubscribeThisOldHouseHe explains the difference b...

Did you know?

Install metal drip edge at the eaves. Then add siding and trim to the new gable roof end. Tying in Perpendicular to Existing Roof. Start tying in a new gable roof …This video shows the transition of a shingle roof to a metal roof. The most trusted Miami roofing contractor professionally describes the installation of thi...Phil walks you through each job step-by-step so you can work on your own roof. How to DIY the me... This shows you exactly how to install metal roof ridge caps. Phil walks you through each job ...To use this method, follow these steps: Prepare the area by identifying where the two roofs will meet. Measure the length of the joined area and add 12 inches. Pick the section where two edges will cross. Install the jack rafters, ensuring they are securely attached to the main rafters.

Dec 27, 2011 ... In this video we show you how to tie in an existing roof with a new roof to avoid any future leaks or issues, putting you back where you ...When it comes to roofing materials, there are a variety of options available. Two of the most popular choices are shingle and metal roofs. Both have their own advantages and disadv...Mar 28, 2012 · Use a speed square to mark the angle; set the pivot point of the square at the top of a board and rotate it until the pitch angle on the "common top cut" scale lines up at the top of the board. Nail those "valley" rafters, to make the edges of the new roof connection, to the existing roof rafters with 16d framing nails and a hammer.Posted March 4, 2017 filed under Roof installation, Roof repair & maintenance. Step flashing is used to provide a water tight connection where roofing adjoins a vertical juncture. This flashing is typically field fabricated from a sheet of 26 ga. to 30 ga. galvanized sheet metal, bent at a 90-degree angle (i.e. bent into an "L" shape).Step 4. Push the tail of the rafter extension up so that it is out of plane with the existing rafter. Alternately, you can hold the back corner of the rafter extension down 1 to 2 inches below the existing rafter. Nail the rafter extension in place by nailing framing nails through the extension and into the existing rafter.

The best way to tie your addition's roof in with the rest of the house is to take cues from the existing architecture. If the addition's roof mimics the look of the existing roof lines, it won't stick out as an obvious add-on. It also helps to copy the pitch of the existing roof since it likely takes important variables such as local climate ...1. Start by removing the old shingles. Use a pry bar to remove the nails holding the shingles in place. Be careful not to damage the underlying roofing material. 2. Once the old shingles are removed, …Nail now, cut later. A second way to install the shingles in an open valley is to run them long through the valley (photo left). Then, after snapping a cutline, trim the shingles with a hook blade in a utility knife, using sheet metal to protect the valley liner (photo right). A controlled double bead. ….

Reader Q&A - also see RECOMMENDED ARTICLES & FAQs. How to tie shingles into an existing roof. Possible cause: Not clear how to tie shingles into an existing roof.

Critical Considerations for Roofing Over Existing Shingles: How to Attach a New Roof to an Existing Roof. Step 1: Properly tie or meet the rooftops. Step 2: Install trusses at the intersections of roof valleys. Step 3: Securely fasten the roofing materials. Step 4: Use drip edge and seal all seams.Set the air compressor and gun depth setting lower. 3. Lay the first row of shingles directly covering the narrow starter row. Snap a horizontal chalk line over the starting row to use as a guide. [2] Cut six inches off the length of the first starter shingle nailed on, then use the rest of them full size.

Mastering the Roof is a comprehensive video series that provides instruction on the installation of GAF residential shingles and roofing systems. Learn more ...Roofing materials such as metal panels, metal shingles, and concrete or clay tiles may be put directly over an existing wood shake roof if the roof is prepared in compliance with Section 1510.4. No tear-off of the current roof coverings is required prior to the placement of a new protective coating over an existing spray polyurethane foam ...My main concern is how to tie the new metal roof into the existing garage shingle roof and how to flash that. Save Share. Like. Show more replies. 0 Reply. Nealtw. 87706 posts · Joined 2017 ... not in the house but runs down onto the asphalt shingles under the metal roofing. I would suggest making the bends in the flashing and at the ...

centricity kaiser scheduling Apr 7, 2024 · Key takeaways: Ridge, rafters, eave, gable end – key components of gable roof. Roof pitch, material consistency, load analysis, drainage, ventilation – design considerations for gable roof additions. Steps: prepare existing roof, match pitch, add ledger board, install rafters and decking, apply underlayment and flashing, match shingles.GAF Timberline Shingles & Roofing Materials | GAF Roofing unitil outage listpublix ridge rd Cut the underlayment to size (or in sections for long valleys), and peel off the entire plastic backer. With a person on each end, fold the underlayment in on itself, sticky side out. Then, lay it into the valley and unfold it. Try to push it down into the crease of the valley as tightly as possible.Framing a Porch Roof,, framing and shingles. How to design a patio roof to match your house. How to build a triangular shed roof. wallace funeral home pleasant hill obituaries the roof to further flush via at least three rainfall occurrences before re-connecting roof water run-off back into the cistern collection system. DO NOT use copper- or iron-based products or solutions to clean or treat a DECRA roof for algae, mildew, lichen, or moss growth. Copper-based products or solutions accelerate corrosion to DECRA roofUsing your nail gun, attach the horizontal beam and cut the two outer rafters to sit flush on top of the existing house roof. Install the two outer rafters and attach a plain rafter beam to the very edge of the existing roof. As you continue to install your rafters, cut the house end of each one so that it fits over top of the plain rafter beam. millyz net worth 2023national scouting report reviewsfree scroll saw patterns for christmas ornaments Place additional horizontals every 16″ until you have enough spanning from side to side to cover the width of your patio roof. 3. Install Ridge Board. Now you can install a ridge board, which is simply a flat piece of lumber that spans from one end to the other and provides support for rafters above it. dubois courier express dubois pa This is where the rubber meets the road in your addition roof project. There are several ways to connect your new roof to the existing one, each with its own unique characteristics. Butt-and-Run Tie-In: Imagine the new roof as a smooth extension of the existing one, creating a sleek, unbroken line. This method involves extending the slope of ...Step 1: Laying the Kickout Flashing. Use your roofing cement to add a layer to the wall against the roof's base. Secure the kickout piece to the cement with nails or screws. After you have placed the kickout flashing, you will continue with step flashing. winchester model 94 32 special serial numbersghost codes to join in gorilla taghow to reset compustar remote Jan 19, 2024 · 1. Start at the Bottom Edge: Begin laying the roofing material at the bottom edge of the roof, ensuring that it overhangs the eaves according to the manufacturer’s specifications. This overhang provides essential protection for the underlying structure and contributes to the overall aesthetics of the shed. 2.Remodel job calls for adding a new roof over 4 ft wide side deck. New roof is a 5 in 12 (about) w/ 6 foot (about) 2″ x 6″ roof joists. Birds mouth (s) of new roof joists are supported by 4″x 6″ beam that runs parallel to and above the side deck – simple enough. The part w/ the questions is the inside end of the roof joists where they ...